HOME TO WWW.GREYWATER.COM.AU .............................................. HOME TO WWW.GREYWATER.COM.AU

THE GREYWATER RECYCLING SYSTEM

The greywater system is delivered with all the components required to install the system. These components include the following -

  1. Installation Plan 1 - 200 Scale Drawing
  2. The Installation, Operation and Maintenance Manual
  3. Distribution Pipes and Connectors
  4. Outlet Housings
  5. Aerobic Grease Filter & "H" Nozzle Components
  6. 20 year warranty

The 100mm sewer pipe and connectors, connecting your house to the GRS, are not supplied and must be installed by a qualified plumber as per the plumbing code AS 3500.

All details for installation are included in the "Greywater Recycling System Installation, Operation and Maintenance Manual."